Alcoves & Storage

Floating shelves
The floating shelves are individually made for most alcoves. They have no visible fixings and are gap-sealed to the wall. The shelves are fixed very firmly and can (depending on walls etc.) take heavy loads such as books. Depending on budget and requirements, they can be made from solid timber or man made boards.

floating shelves in (from left) solid oak, solid softwwod and walnut veneer.

Alcoves

2 similar TV storage units. Edwardian Houses, St Leonards, Exeter.

Wardrobes
Wardrobes and storage can be made to any size as everything is made from scratch, I am glad to work with you to come up with a design solution that maximises the space and fits your storage needs. Materials can be softwood or manmade boards of all types. I often use birch ply for wardrobe interiors as it is high quality, strong and a great looking material.

Shelves
I have made a number of fitted bookshelves for storage and home office situations.

Fitted bookshelves from softwood and manmade board fitted in Georgian House, Topsham, Devon.

Fitted bookshelves in softwood and manmade board. Georgian House, Pennsylvania, Exeter

Study shelves & living room shelves. Exeter.

Alcove Storage Units, Exeter, 2013

Home Office, shelving & integrated Desk. Exeter, 2014

Softwood and manmade board landing storage. Coach House, Pennsylvania, Exeter

Oak and painted softwood, St Leonards, Exeter.

Wall unit. Cupboards with shelves above. Painted MDF & softwood. Modern property. Devon.

Large slidding wardrobe with mirror doors. Topsham, Devon