Floating shelves


The floating shelves are individually made for most alcoves. They have no visible fixings and are gap-sealed to the wall. The shelves are fixed very firmly and can take heavy loads such as books. Depending on budget and requirements, they can be made from solid timber or man made boards.

Costs:- Shelves made in solid wood, for example oak, usually cost between £70 and £130 per shelf depending length and thickness.

Manmade boards/softwood are about £40 to £70 fitted and painted. (No VAT added)

Oak Shelves Topsham

Oak Shelves, Dawlish

Oak Shelves, St Leonards, Exeter

Floating softwwod shelves, St Leonards, Exeter

St Leonards, Exeter